What do you use for time-tracking & how do you use it (esp. IQ)

Submitted by Tom on 2013/01/22 06:43
What do you use for time-tracking & how do you use it?
 
Within IQ, I'm especially interested in whether I can use/show time-tracking items between the grids and the calendar (Note: I still know next to nothing about the calendar).
 
 
My own history of time-keeping with IQ:
 
I worked on drawings for longer periods of time:
  • each drawing would have an item/link
  • I would make a sub-item for each time period spent woking on that file
  • Other work I would group, e.g.

Duplicating a grid in pre-7

Submitted by Jon on 2013/01/21 16:59
Not sure about this, maybe it is me.
 
I'm trying to create a duplicate grid named 2013 based on 2012. The dialogue is ticked to open the new grid. It opens with the 2012 information. I now want to change my source to 2013, but cannot. 2013 is not listed in the dropdown (either in the sourcebar or manage grids). If I manually enter 2013 as the source, IQ reports an error reading the grid. Re-starting IQ does not resolve this. HOWEVER...
 
If I follow the above steps but clear the option to open the grid, 2013 appears on the dropdown and I can successfully change the source. Why is this?
 
Jon

Dragging gantt bars in pre-7

Submitted by Jon on 2013/01/03 13:39
I'm trying to create and manage several projects. So far everything is going well with regard to IQ. However, I seem to be unable to accurately or reliably resize a gantt bar. I have to rely on typing or selecting the dates from TaskEnd or TastStart fields. I also noticed that I have to refresh the grid manually to see the results in the gantt chart. Also, after selecting dates as described above, any attempt to re-size the gantt bar results in an unwanted date. What's up?
 
Jon