Jumpy scrolling with vertical calendar multi-day views

Submitted by LeftEccoForIQ on 2025/04/15 09:30
Forums

For the 3 or 2-day view, vertical scrolling is very jumpy / choppy. Apparently you've set it up so that after scrolling ends, IQ adjusts the scroll state so that the topmost fully visible day is scrolled up to the top of the window. While this may be nice in theory, the effect is rather choppy and it sometimes feels like the scroll is moving backward almost as much as forward.

Cheers

Problems erasing repeating calendar events

Submitted by LeftEccoForIQ on 2025/04/15 03:03
Forums

With several repeating calendar events I've had difficulties getting them to disappear from the calendar, even though I had never consciously created any exceptions from a series. In particular, there seems to be no effective 'nuke' option to get rid of everything connected with the event / item. I've tried:

1. Delete item(s) - no effect on the particular calendar event though I can now no longer find the item through live search. Which again seems strange as the item text is still in the database somehow, isn't it?

values for item listed multiple times in Properties Pane > Item Properties > Values

Submitted by jimspoon on 2025/03/24 23:26
Forums

I'm really liking the Properties Pane filter and the selectable headings for better keyboard navigation.  But I'm seeing a bug in 127.0Pre12 which is easily seen in the following Properties Pane screenshot.  The set of fields and values for the current item is shown multiple times under Properties Pane > Item Properties > Values, instead of just once:

 

Slow paste of new items within a Scratch grid if multiple Scratch grids open

Submitted by dderkits on 2025/03/22 11:22
Forums

Scenario:

I want to paste, say, 50 items as sub-items to a pre-existing item. I select an existing sub-item of the item and paste (pasting by selecting 1- Plain Text and then 2- Paste all lines into selected item(s). 49 new items will be created).

Result:

If I do the above in a regular Grid, fast.

If I do the above in a Scratch grid, where just one Scratch grid is open under IQ, fast.

How to scroll by week in calendar (KB shortcut)?

Submitted by LeftEccoForIQ on 2025/03/07 08:23
Forums

Hi Pierre, not really a bug but a "lost" feature: Before the recent calendar-related update that changed the cursor behaviour when focus is on the calendar, I could use cursor up / down to move through the calendar in weekly increments. Currently, when the focus is outside, the "scheduled area" (not sure this describes it correctly), I can use cursor / up down to move by day and Ctrl-up/down to move by week but this does not work when an individual event is focused.

Specific multi-day appointment not syncing with Google Calendar

Submitted by LeftEccoForIQ on 2025/02/20 02:34
Forums

I've recently done a full sync to try to get this event to sync but no luck. The only difference between this multi-day appointment and another one that's being synced without issue is that the one that works correctly only has thein default 45 min before appointment reminder while the problematic one has a very long list of reminders (10w,  8w,  6w,  4w,  2w,  1w,  5d,  3d,  2d,  1d). Could this be preventing the event from being synced?

Thanks!!